Photo depicts a an International truck heading to Horetzky Creek Camp on the Horetzky Valley Road.
Notes
Morrison-Knudsen Company had several roads such as this one, constructed to get workers and equipment to the various work sites for tunnel construction. 985.65.80
Photo depicts an International truck heading to Horetzky Creek Camp on the Horetzky Valley Road.
Notes
Morrison-Knudsen Company had several roads such as this one, constructed to get workers and equipment to the various work sites for tunnel construction. 985.65.80
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.
Photo depicts Electrician Bill Frahler's family standing beside his truck. Johnson-Crooks houses under construction in Nechako Neighbourhood are in the background.
Photo depicts Electrician Bill Frahler's family standing beside his truck. Johnson-Crooks houses under construction in Nechako Neighbourhood are in the background.
Notes
Title based on content of photograph. -- "Alva and the Boys", Slide No. 95 -- Bill Frahler wired over 2,000 temporary construction and permanent homes between 1954 and 1958, first working for Johnson-Crooks and then Straits Construction. Bill Frahler Collection 2003.32
Photo depicts workers excavating for the construction of the alumina storage building.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-451. -- Sloping sides avoided cave-ins. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.267
Photo depicts the permanent Kemano townsite at Camp No. 5. View is looking towards beach. Seen on the left are permanent homes for powerhouse staff. On the right are the temporary buildings known as quonset huts used during the construction years as crew quarters.
Photo depicts the permanent Kemano townsite at Camp No. 5. View is looking towards beach. Seen on the left are permanent homes for powerhouse staff. On the right are the temporary buildings known as quonset huts used during the construction years as crew quarters.
Notes
Title based on content of photograph. -- Alcan ID No. 2KR-298. -- Permanent housing construction began in 1957. Alcan Collection
Photo depicts Carl Agar looking up at Bill McLeod who is piloting a Sikorsky helicopter.
Notes
Fourteen Sikorsky S-55 helicopters were used as workhorses and load carriers during construction. Carl Agar and his crew with Okanagan Helicopters took men and materials to otherwise inaccessible spots. Without these helicopters, Project engineers would never have maintained the construction schedule. Photographed by Art Hundert. Kitimat Heritage Advisory Commission Collection
Photo depicts seven International L-190 trucks, complete with Jaeger ready-mix concrete machines. These trucks were the first installment of a large fleet at Kitimat.
Photo depicts seven International L-190 trucks, complete with Jaeger ready-mix concrete machines. These trucks were the first installment of a large fleet at Kitimat.
Notes
Title based on content of photograph. -- International Harvester Company No. C 6101. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. -- In early July these trucks were waiting for the completion of the batching plant installation. The trucks carried concrete directly to the new smelter in the townsite and assisted in all other town and smelter construction. -- The batch plant was located at "Gravel Mountain" - the sandhill. Hal Whiting Collection 985.65.107
Photo depicts a worker with a double-headed axe on the Alcan Project posed at a waterfall located in the Kemano area.
Notes
Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.76
Photo depicts a surveyor on the Alcan Project surveying and posed beside a waterfall located in the Kemano area.
Notes
Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. -- ID No. C6067. Hal Whiting Collection 985.65.79
Photo depicts two men loading supplies for construction of the transmission line into a Bell helicopter. The transmission line right-of-way is seen in the background.
Photo depicts two men loading supplies for construction of the transmission line into a Bell helicopter. The transmission line right-of-way is seen in the background.
Notes
Title based on content of photograph. Kitimat Heritage Advisory Commission Collection
Photo depicts the welcome sign for Kitimat on the wharf that greeted all workers to the Kitimat Project upon their arrival by boat.
Notes
Title based on content of photograph. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.113
Photo depicts an International crawler hauling one of the temporary living quarters at Camp No. 5 in Kemano.
Notes
Title based on content of photograph. -- The International Harvester Company were manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.77