Illustration depicts the extent of the Project, from the Kenney Dam and reservoir area to the transmission line and smelter. The future tunnel or the Kemano Completion Project is also included.
Illustration depicts the extent of the Project, from the Kenney Dam and reservoir area to the transmission line and smelter. The future tunnel or the Kemano Completion Project is also included.
Notes
Illustration from Alcan's publication "Kitimat-Kemano, Five Years of Operation, 1954-1959". Alcan Collection
Photo depicts two workers looking on as a Sikorsky S-55 helicopter brings in a load of supplies to the transmission line camp atop Kildala Pass.
Notes
Photographed by the International Harverster Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.82
Photo depicts an International TD-24 crawler dozing tunnel muck at the 2600' camp above the Kemano Valley.
Notes
ID No. C 6098. -- Title based on content of photo. -- The International Harvester Company, manufacturers of construction equipment such as this crawler purchased for the Project. Hal Whiting Collection 985.65.75
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection
Photo depicts a International diesel TD-24 spreading a layer of large stones at the base of the Nechako Dam.
Notes
ID no. C 5927. -- Title based on content of photo. -- These layers of various size rock stone and clay will all slope towards the rock fill at about a 45 degree pitch. Official naming ceremony renamed dam the Kenney Dam. Hal Whiting Collection 985.65.56
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Notes
Title based on content of photograph. -- Alcan ID No. KR-1160. Alcan Collection
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Notes
Title based on content of photograph. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.99
Title based on content of photograph. -- Haisla Bridge, Kitimat's first permanent bridge was completed by the end of 1953 and officially opened in 1957. -- The cost was over one million dollars. District of Kitimat Collection. District of Kitimat Collection 987.10.2