Title based on content of photograph. -- Haisla Bridge, Kitimat's first permanent bridge was completed by the end of 1953 and officially opened in 1957. -- The cost was over one million dollars. District of Kitimat Collection. District of Kitimat Collection 987.10.2
Photo depicts the permanent Kemano townsite at Camp No. 5. View is looking towards beach. Seen on the left are permanent homes for powerhouse staff. On the right are the temporary buildings known as quonset huts used during the construction years as crew quarters.
Photo depicts the permanent Kemano townsite at Camp No. 5. View is looking towards beach. Seen on the left are permanent homes for powerhouse staff. On the right are the temporary buildings known as quonset huts used during the construction years as crew quarters.
Notes
Title based on content of photograph. -- Alcan ID No. 2KR-298. -- Permanent housing construction began in 1957. Alcan Collection
Photo showing Columbia Bridge is coming down and will be out of service for about another month according to the municipal engineering department. The old stringers are to be removed Friday and following that the main culvert will be installed and the cavity filled and eventually paved. Kuldo Bridge is to get the same treatment once Columbia is back in use.
Current: 1960s
-District of Kitimat
-Miscellaneous
Scope and Content
Photo showing Columbia Bridge is coming down and will be out of service for about another month according to the municipal engineering department. The old stringers are to be removed Friday and following that the main culvert will be installed and the cavity filled and eventually paved. Kuldo Bridge is to get the same treatment once Columbia is back in use.
Photo depicts the Bailey Bridge across the inner end of the access tunnel with form work in the background. View is from a high elevation under the roof looking northwest.
Photo depicts the Bailey Bridge across the inner end of the access tunnel with form work in the background. View is from a high elevation under the roof looking northwest.
Notes
Title based on content of photograph. Alcan Collection
Photo depicts an aerial view of Kitimat, seen is land cleared for Neighbourhood "D" and the Whitesail neighbourhood under construction, right foreground. The Alcan smelter and channel are in the background.
Photo depicts an aerial view of Kitimat, seen is land cleared for Neighbourhood "D" and the Whitesail neighbourhood under construction, right foreground. The Alcan smelter and channel are in the background.
Notes
Title based on content of photograph. Max Patzelt Collection - 1998.1.8351
Photo depicts the area between Twin Peaks and Pass Summit showing Camp No. 10, the concrete batching plant and several of the tower sites. View from Twin Peaks.
Photo depicts the area between Twin Peaks and Pass Summit showing Camp No. 10, the concrete batching plant and several of the tower sites. View from Twin Peaks.
Notes
Title based on content of photograph. -- Alcan ID No. KR-520. Alcan Collection
Photo depicts two workers looking on as a Sikorsky S-55 helicopter brings in a load of supplies to the transmission line camp atop Kildala Pass.
Notes
Photographed by the International Harverster Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.82
Photo depicts a section of Camp No. 5, Kemano, also known as "The Village", looking north-east along one of the streets in the Wachwas trailer camp in winter.
Photo depicts a section of Camp No. 5, Kemano, also known as "The Village", looking north-east along one of the streets in the Wachwas trailer camp in winter.
Notes
Title based on content of photograph. -- Alcan ID No. KR-702. Alcan Collection